Cockburn High School, Leeds

Client:
Education Leeds
Consultant:
Watts
Service:
Contract Administration and Environmental Audit
Project Cost:
120,000

Watts was commissioned to design and project manage an extension on to Cockburn High School. The extension (Phase 1) was required to facilitate the construction of a second extension (Phase 2), which had been designed by the council architects. Following a very short fee-tendering procedure, the design was prepared in conjunction with structural, and mechanical and electrical engineers.

Watts procured the building works through a traditional contracting route and the project was completed on target and within the specified budget. This paved the way for Phase 2 to commence shortly afterwards.

The original extension works were already well underway when the facilitation works were identified. Therefore, Watts had to undertake Phase 1 to a tight timescale.