Watts was appointed to provide design and specification, contract administration and CDM coordination services for South Camden Community School. The roofing project to the 1960s main hall building, comprised making good any substantially defective areas of the existing roof covering, providing a hot applied single-layer roofing felt and installing a guided horizontal fall restraint-cable system. Watts acted as lead consultant, CDM coordinator and contract administrator on this project.
Watts’ brief was to install a single layer roof overlay membrane on top of the existing defective roof covering, to reinstate the roof’s water tightness for a guaranteed period of ten years. Watts was also commissioned to install a fall arrest system to facilitate future maintenance works.
|